
Road construction started last week on a damaged section of the Natchez Trace Parkway at milepost 94.8, south of Ridgeland. This section has been closed since March due to a failure in the road base that made the road unsafe for vehicular travel.
Links:
[1] http://www.northsidesun.com/content/subscribe
[2] http://www.northsidesun.com/user
[3] http://www.northsidesun.com/category/featured/featured
[4] http://www.northsidesun.com/category/section/news/local-news
[5] http://www.northsidesun.com/category/tags/natchez-trace
[6] http://www.northsidesun.com/category/tags/national-park-service