
By KATIE EUBANKS
Sun Staff Writer
THE NATIONAL Park Service is spending $750,000 and has shut down eight miles of the Natchez Trace Parkway to fix a problem caused by something many Northsiders are familiar with: Yazoo clay.
Crews with Miami-based Dozier and Dozier Construction are digging out and rebuilding a half-mile stretch near milepost 94.8, west of Ridgeland, that has sunken in after a slide occurred between weathered and un-weathered layers of clay.
Links:
[1] http://www.northsidesun.com/content/subscribe
[2] http://www.northsidesun.com/user
[3] http://www.northsidesun.com/category/featured/featured
[4] http://www.northsidesun.com/category/section/news/local-news
[5] http://www.northsidesun.com/category/tags/natchez-trace-parkway
[6] http://www.northsidesun.com/category/tags/yazoo-clay